Facility Bio
- Pittsburgh, PA
 - High traffic, downtown Central Office
 - 550,000 ft² downtown facility totaling 20 floors
 - Three (3) McQuay constant speed chillers
 - 4,500 tons cooling capacity
 - Mission critical, 24/7 operations
 
Situation
- Major upgrade to chiller plant infrastructure
 - Upgrade could not disrupt Central Office traffic
 - Inadequate control redundancy for critical operation
 - Low ΔT and high kW/ton due to inefficient hydronic configuration and control sequence
 
Solution
- Convert hydronic system to Variable-Primary configuration
 - Install redundant PLC-based Control Engine Optimization system(CEO®)
 - Integrate CEO® with Metasys building automation system
 
Results That Exceed Client Expectations
Financial Savings
- $85,000 in annual energy savings
 - 2.3-year payback
 
Energy Impact
- 1.3 million kWh saved annually
 - .36 kW/ton efficiency improvement
 
Operational Benefits
- Control system upgraded to N+1 redundancy standard
 - Reduced troubleshooting response time
 